How We Work

Don't trust us. Verify us.

This page is the public version of the diligence dossier every buyer's lawyer eventually asks for. It is here so you can ask the questions you should ask before any registration, any meeting, any payment.

The Land

The site for Project I is Block IV, Plots 2 & 3, in the Layout of Educational Zone at South-West Ring Road, Ibadan, Oyo State. The land originated from a 3.538 hectare parcel granted under a Certificate of Statutory Right of Occupancy (Volume 3053, Page 60) in 1992 by the Oyo State Government.

The parcel was officially sub-divided in 2019 by the Ministry of Lands, Housing & Survey (Sub-Division Plan No IB.1752, reference LLA 0647/T/21). Plots 2 & 3 of Block IV were assigned to LivMalik's founder, Adebayo "Malik" Adekola, by Deed of Assignment, prepared by Bashmash Solicitors. Governor's Consent under the Land Use Act is currently in progress at the Oyo State Lands Bureau.

What this means for you, the buyer: the title chain runs from the original 1992 Certificate, through the 2019 sub-division, to the Deed of Assignment in our name. Every step is documented, every step is verifiable through the Ministry of Lands and the Lands Registry at Ibadan. We do not sell, take deposits, or transfer to buyers until Governor's Consent is granted and the Deed is fully registered.

The Money

Three principles govern how LivMalik handles buyer funds. They are non-negotiable.

One. Payments tied to progress.

All buyer payments follow a milestone schedule tied to verified construction progress. You pay as the build advances, not upfront.

Two. Milestone-locked, not time-locked.

The payment schedule is:

If the build is delayed, your payment is delayed with it. You are never paying for a milestone that has not happened.

Three. USD or NGN, your choice.

Diaspora buyers can transact in USD to LivMalik's corporate USD account, locked at the CBN rate on the signing date. Local buyers transact in NGN. We do not offer parallel-market rate gymnastics.

The Build Quality

Every home in Project I is built to the same specification. The spec is published before contract and does not change between contract and handover.

Detailed specification document available to your lawyer on request.

The Verification

Three things you can do, today, before talking to us, that will tell you whether we are who we say we are.

  1. Search "LivMalik Limited" on the CAC public search portal once registration completes (in progress).
  2. Verify "Volume 3053, Page 60" and "Plan IB.1752" at the Lands Registry, Ibadan, in person or through any property lawyer.
  3. Verify Bashmash Solicitors and Basirat F. Momoh Esq. at the Nigerian Bar Association.

If any one of those does not check out, walk away. We would rather lose a sale to caution than win one to misrepresentation.

The Timeline & Guarantees

Project I started construction in Week 1 of 2026. The target handover window for all three homes is late 2026 to early 2027, approximately 8 to 10 months from start. The schedule includes a four-week buffer for the unexpected (weather, materials shortages, labour holidays).

If handover slips beyond the buffered date, the sale agreement includes a liquidated damages clause: 0.5% of the purchase price per week of delay beyond month 12, payable to the buyer. This clause is in the contract before you sign. We hold ourselves to dates we can keep.

How Milestone Payments Work

Payments are structured around verified construction milestones:

  1. 10% reservation deposit to lock your chosen home
  2. 25% at signing of the Sale Agreement
  3. 25% at completion of roofing
  4. 25% at completion of finishing
  5. 15% on handover and title transfer

You are buying construction progress, not promises.